Images from the ten-year overhaul after 2005

The backhead cladding in gloss black, the brake pedestal in place with vacuum brake valve in position and the pipework starting to go in and the brackets for the injector steam valve controls refitted. 21 June 2015. P GIBBS

Hardwood for the new cab floor 21 June 2015 P GIBBS

The reinforcing pads are fitted, onto which will be bolted the footplate support brackets. 21 June 2015. P GIBBS.

The big pipe to the exhaust steam injector is bolted up with the T-piece for the carriage warming system in place behind one of the brackets. 21 June 2015 P GIBBS.

The smokebox floor liner is in place. 21 June 2015. P GIBBS.

Brake pedestal in cab with blower and sanding valves installed plus steam brake lubricator. Driver's vacuum brake valve is on top and steel pipework for vacuum system is now complete. 1 July 2015. P GIBBS

New covers for rocking grate operating levers. 1 July 2015. P GIBBS.

Cab fittings added since last week are both water gauge frames, regulator mounting bracket and steam brake valve (above brake pedestal) and gauges bracket on the right hand side. Behind the brake pedestal can be seen the copper pipework which goes to the ejector and brings steam from the manifold. 7

The curved plate sitting on buffer beam is access panel for top of smokebox. This will carry the mounting block for the whistle and gives access from above to the superheater header. 7 July 2015. P GIBBS.

Internal view of smokebox, showing hole for chimney and access panel with retaining bolt holes. 7 July 2015. P GIBBS.

External view of smokebox showing large hole for steam pipe to cylinder. To left are the mounting plate for the ejector exhaust elbow and, below it, the steam feed for the blower. The two smaller holes at the top and at the front left are for the handrail stanchions. 7 July 2015. P GIBBS.

A brief chance to see Camelot outside whilst she is moved to the Running Shed. Looks good! 7 July 2015. A KELLY

The superheater is back in place, ready for the new elements that have to be fabricated. 7 July 2015. A KELLY.

View through the cab shows floor installed (both wooden and steel sections) and pipework to steam brake and brake pedestal. P GIBBS, 12 July, 2015.

External smokebox view shows steam pipe to cylinder in place and handrail on. New rivet heads indicate mounting block inside for supporting the superheater header. P GIBBS, 12 July, 2015.

Internal smokebox view shows superheater header in place, with steam pipes to cylinders attached. P GIBBS, 12 July, 2015.

The left hand side of the cab shows: (1) The valve towards the top is the vacuum ejector duplex valve (2) Below the running plate is the cylinder drain cock actuating valve. This valve has a drain which is attached to the large pipe behind it, this large pipe being for water delivery from the inject

Castings bolted on around the steam pipe to the cylinder on the right hand side. These seal the opening in the smokebox and prevent air being drawn in and destroying the partial vacuum when the engine is working. 18 July, 2015. P GIBBS.

The smokebox is rubbed down and painted, and the chimney is in place. P GIBBS, 26 July 2015.

The steam pipes to the cylinders are fitted. P GIBBS, 26 July, 2015.

The whistle valve is in place. P GIBBS, 26 July, 2015.

The whistle operating rod has been cleaned up and painted. P GIBBS, 26 July, 2015.

One week later, the whistle operating gear is back in place in the cab. P GIBBS, 1 August, 2015.

Camelot is back in the Workshop as the roof is now complete and the side cladding above the Running Shed is also finished. P GIBBS, 1 August, 2015.

The tender tank (in the Horsted Keynes paintshop) is now gloss black all over. P GIBBS, 1 August, 2015.

The Tender has been returned to Sheffield Park and reunited with the Locomotive. P GIBBS, 9 August 2015.

A close view of the paint job. P GIBBS, 9 August 2015.

Cab roof back in place. P GIBBS, 9 August 2015.

The refurbished Chimney Petticoat, 13 August 2015, P GIBBS.

New fabricated Superheater Elements, 13 August 2015, P GIBBS.

Work continues around the Firebox and Cab, 16 August, 2015, P GIBBS.

General view, in works. BEN JENDEN, 17 August 2015.

Firebox in gloss black. P GIBBS 23 August 2015.

Ejector exhaust fitted. P GIBBS, 23 August 2015.

In works, general front view. 23 August 2015.

Drawbar and Brake Pull Rods, P GIBBS, 30 August 2015.

Superheater Elements ready for fitting, P GIBBS, 30 August 2015.

Superheater Elements; first row bolted in place, second row fitted but not yet attached. P GIBBS, 30 August 2015.

Detail, Tender Fall Plate and Water Connection, P GIBBS, 30 August 2015.

Vacuum Brake Ejector fitted, P GIBBS 30 August 2015.

The Blowdown Silencer 6 September 2015 P GIBBS

The Locomotive and Tender have been moved together, the smokebox door is still supported on a chain 6 September 2015 P GIBBS

Clack valve and delivery pipe 13 September 2015 P GIBBS

Injector and carriage warming steam pipework 13 September 2015 P GIBBS

Sand ejector 13 September 2015 P GIBBS

Smokebox door now fitted 13 September 2015 P GIBBS

Almost finished, a general view, JOHN SANDYS, 19 September 2015.

Vacuum ejector pipework 20 September 2015 P GIBBS

Here are images from the heavy overhaul, 2005 - 2015.