2018

Seen from the Observation Saloon, about to enter Sharpethorne  Tunnel, BRIAN LACEY, 31 March, 2018.
Seen from the Observation Saloon, about to enter Sharpethorne Tunnel, BRIAN LACEY, 31 March, 2018.
View of the new left front cylinder cover NICK WREN, 7 March 2018.
View of the new left front cylinder cover NICK WREN, 7 March 2018.
View of the new left rear cylinder cover NICK WREN, 7 March 2018.
View of the new left rear cylinder cover NICK WREN, 7 March 2018.
View of the new piston head, NICK WREN, 7 March 2018.
View of the new piston head, NICK WREN, 7 March 2018.
"Camelot" about to be shunted back into the workshop for reassembly of the left cylinder, BRIAN LACEY 8 August 2018.
"Camelot" about to be shunted back into the workshop for reassembly of the left cylinder, BRIAN LACEY 8 August 2018.
Back in service and entering East Grinstead,  BRIAN LACEY, 21 August 2018.
Back in service and entering East Grinstead, BRIAN LACEY, 21 August 2018.
BRIAN LACEY, 25 August 2018
BRIAN LACEY, 25 August 2018
REUBEN "CUBE" SMITH, 25 August 2018
REUBEN "CUBE" SMITH, 25 August 2018
BRIAN LACEY, 1 September 2018
BRIAN LACEY, 1 September 2018

More images of "Camelot" serving on the Bluebell Railway. In April, the locomotive failed at Kingscot when the left cylinder cover fractured. After manufacture of new parts and attention in the workshop, she was back working in August.

Share this page