73082 Camelot Locomotive Society
The Society owns the preserved British Railways Standard 5MT Steam Locomotive 73082 Camelot, which runs on the Bluebell Railway in Sussex, Southern England. Follow the links to learn more about us.
Menu
  • Home
  • History
    • History Timeline
  • Photo Album
    • 1955+ BR Days
    • 1966+ Barry Days
    • 1978+ Restoration
    • 1995+ Bluebell Days
    • 2005+ Overhaul
    • 2017 More Work
    • 2017 In Service
    • 2018
    • 2018 Minehead Visit
    • 2019
    • 2020
    • 2020 Steamlights
    • Heavy Overhaul 2021
    • 2021
    • 2022
    • 2022 Giants of Steam
    • Bits and Pieces
    • Small Camelots
    • Sales Stand Days
    • The CCT
  • Videos
    • Test Run 2015
    • AGM Special 2015
    • S'Park-Kingscot 2004
    • Cabride (1)
    • Cabride (2), firing
    • Cabride (3), tunnel
    • Cabride (4), extn
    • Backing down SP yard
    • Ex Sheffield Park
    • Raising the Echoes
    • Ruscombe
    • Near Bath
    • Norton Fitzwarren 1
    • Bishops Lydeard
    • On the WSR Turntable
    • Norton Fitzwarren 2
    • Passing Taunton
    • Cabride (5), testing
  • Technical Stuff
    • Society MREs
    • 107 Through Andover
    • Design and Construct
    • Dimensions
    • "RMT News" History
    • Bibliography
  • News and Events
  • Membership
  • 2021 Appeal
  • Links

2018

Seen from the Observation Saloon, about to enter Sharpethorne Tunnel, BRIAN LACEY, 31 March, 2018.

View of the new left front cylinder cover NICK WREN, 7 March 2018.

View of the new left rear cylinder cover NICK WREN, 7 March 2018.

View of the new piston head, NICK WREN, 7 March 2018.

"Camelot" about to be shunted back into the workshop for reassembly of the left cylinder, BRIAN LACEY 8 August 2018.

Back in service and entering East Grinstead, BRIAN LACEY, 21 August 2018.

BRIAN LACEY, 25 August 2018

REUBEN "CUBE" SMITH, 25 August 2018

BRIAN LACEY, 1 September 2018

More images of "Camelot" serving on the Bluebell Railway. In April, the locomotive failed at Kingscot when the left cylinder cover fractured. After manufacture of new parts and attention in the workshop, she was back working in August.

Share this page

  • Share on Facebook
  • Share on Twitter